Such improvements then as directly affect the workmen
least should be started first. At the same time it must be remembered
that the whole operation is of necessity so slow that the new system
should be started at as many points as possible, and constantly pushed
as hard as possible. In the metal working plant which we are using for
purposes of illustration a start can be made at once along all of the
following lines:
First. The introduction of standards throughout the works and office.
Second. The scientific study of unit times on several different kinds of
work.
Third. A complete analysis of the pulling, feeding power and the proper
speeding of the various machine tools throughout the place with a view
of making a slide rule for properly running each machine.
Fourth. The work of establishing the system of time cards by means of
which ultimately all of the desired information will be conveyed from
the men to the planning room.
Fifth. Overhauling the stores issuing and receiving system so as to
establish a complete running balance of materials.
Sixth. Ruling and printing the various blanks that will be required for
shop returns and reports, time cards, instruction cards, expense sheets,
cost sheets, pay sheet, and balance records; storeroom; tickler; and
maintenance of standards, system, and plant, etc.; and starting such
functions of the planning room as do not directly affect the men.